Project Details

HARBOUR DOLPHIN

Barge Salvage & Cargo Recovery Operation

Project Overview

FES Challenger Salvour & Builders successfully carried out the salvage and stabilization of the Malaysian steel deck barge HARBOUR DOLPHIN, which developed a severe 30–40° port list while at Manila Bay due to cargo shifting and flooding of multiple void spaces.

Upon appointment by the vessel owner, our salvage team immediately conducted underwater inspections, damage assessment, and stability calculations. Through controlled ballasting and de-ballasting operations, water ingress management, and the safe removal of damaged stanchion posts, the barge was successfully restored to an even keel, ensuring its structural stability and preventing further deterioration.

As the vessel was restricted from berthing directly at Manila Harbour Centre Port, FES Challenger developed an alternative cargo recovery solution by chartering a steel deck barge with two assisting tugboats. The team safely discharged and transferred 1,395 bundles of sawn timber over seven successful voyages to Delpan Port without additional damage to the vessel or cargo.

This project highlights FES Challenger’s expertise in marine salvage, vessel stabilization, cargo recovery, and complex port logistics. Through careful engineering, experienced personnel, and safe operational practices, the operation was completed efficiently while minimizing risks and protecting valuable assets.